Pearson & Associates provided electrical design for the 14 Megawatt, 34,500 volt electrical distribution system upgrade for snowmaking and lifts. This work was performed in multiple stages from 1999 through 2006.
Snowmaking Facilities involve complex integration of air, water and power to insure quality snow produced with efficient use of water and power.
Proper planning and design of the electrical systems insure a neat and clean installation that functions at high efficiency levels. Stowe Mountain Resort received significant incentives from Efficiency Vermont for the Electrical Power and Control Systems for the snowmaking installation.